Tren Maya SECTION 4 Merida – Cancun

Client: ICA-AECOM. Project Description: Adaptation of El Mayab highway to a single A4S body,  adaptation  of  the  other  body  to accommodate the railroad tracks for the Tren Maya, with a length of 220 km. Contracted scope: Development of basic engineering Executive project of 28 underpasses (geometry and structures) Executive project of 64 livestock overpasses (geometry…

CM and control for Lecheria-AIFA Suburban Train Line

Client: Ministry of Infrastructure, Communications and Transport. Project Description: Construction of the vehicular overpass at the crossing with the railway at km 25+400, Av. Lago de Guadalupe, Tultitlan and the construction of the vehicular overpass at the crossing with the railway at km 26+950, Mariano Matamoros Street, Tultepec, Estado de Mexico, for the expansion of…

Tren Maya section 6, front 7 (Chetumal-Bacalar)

Client: SEDENA Project Description: 6 viaducts of different length trains: V1=727 m, V2=80 m, V3=185 m, V4=1073 m, V5=462 m and V6=600 m. 4 Vehicle Bridges of 600 m in length each, considering turnarounds at grade level. 3 underpasses of approximately 320 m each. Contracted scope: Geotechnical exploration and  recommendations,mechanics surveys and pavement design. Geometric…

Maya Train – Section 5 North Cancun-Playa del Carmen

Client: Consorcio Acciona & Grupo Mexico. Project Description: Extension of the Mexican Southeast Development master plan, expansion of the Tren Maya railway line in the Cancun – Playa del Carmen section. Contracted scope: Exploration campaign for the railways: Open Pit Wells, Controlled advance boreholes, Mixed soundings, Permeability tests and piezometric measurements. Electronic processes of the…