Client: Mexica de Técnicos en Autopistas S.A. de C.V.
Project Description: New A4S high specification highway, alternate route to Highway 57 on the Ventura-Peyote section, 38.5 km in length.
Contracted scope:
- Technical feasibility study
- Topographical Survey
- Hydrological Study
- Soil mechanics survey, geophysics study on slopes, pavement design.
- Geometric design and electronic processes
- Structural project (12 bridges and 2 junction roads)
- Drainage and complementary works
- Executive project of the toll booth
Location: San Luis Potosí