Entronque San Francisco

Cliente: Secretaría de Infraestructura, Comunicaciones y Transporte. Descripción del proyecto: Tramo carretero Barranca Larga – Ventanilla de la Autopista Oaxaca – Puerto Escondido. Eentronque San Francisco que cuenta con una estructura del PSV tiene longitud de 28.50 apoyada sobre estribos entre las estaciones 140+029 a 140+057.50 El terraplén de la troncal se confinará por muros…

Tren Maya SECTION 4 Merida – Cancun

Client: ICA-AECOM. Project Description: Adaptation of El Mayab highway to a single A4S body,  adaptation  of  the  other  body  to accommodate the railroad tracks for the Tren Maya, with a length of 220 km. Contracted scope: Development of basic engineering Executive project of 28 underpasses (geometry and structures) Executive project of 64 livestock overpasses (geometry…

Overpass of the Federal Highway 2 Juarez – Ascension roundabout

Client: COCONAL SAPI Project Description: The construction consists of an overpass, as well as the incorporation of the surrounding branch roads to give better mobility to the area, 3 lanes in each direction. Project Scope: Traffic Study Soil mechanics survey and pavement design Geometric Project Structural Project Hydraulic Project Lighting project Location: Ciudad Juárez, Chihuahua.

CM and control for Lecheria-AIFA Suburban Train Line

Client: Ministry of Infrastructure, Communications and Transport. Project Description: Construction of the vehicular overpass at the crossing with the railway at km 25+400, Av. Lago de Guadalupe, Tultitlan and the construction of the vehicular overpass at the crossing with the railway at km 26+950, Mariano Matamoros Street, Tultepec, Estado de Mexico, for the expansion of…

Coordination and CM of the works of the Real del Monte – Huasca highway

Client: Ministry of Infrastructure, Communications and Transport (SICT) Project Description: Construction of a new A4 highway from the Real del Monte junction road to the Huasca junction road, with a length of approximately 9 km, consisting of 2 tunnels of approximately 800 meters, 2 junction roads and 6 viaducts of 200 meters. Contracted scope: Coordination…